Pre-production sample: the last sign-off before your order is made
Published by Manufacturer Quotes. Editorial policy. Updated .
Definition
A pre-production sample (PPS) is a unit made with the materials, components, tooling and methods the factory will use for your order, sent for your approval before production starts. Once you sign it off, it becomes the standard the order is made and inspected against. US government buyers call the equivalent a first article.
Where it sits among the samples
| Sample | Made from | What you decide |
|---|---|---|
| Prototype | Whatever proves the idea: printed, machined or hand-made parts | Whether the design works and appeals |
| Development samples | The factory's first attempts from your spec, often with substitute materials | What to change in the spec |
| Pre-production sample | Production materials, components, tooling and methods | Whether production can start |
| Production samples | Units pulled from the running order | Whether the order matches the approved sample |
The pre-production sample is the first one that shows what the order will actually be. A development sample in the right colour but the wrong fabric does not answer that; the pre-production sample does.
Why the approval matters
US federal purchasing rules set out the same step for government contracts. They define a first article as a preproduction model, initial production sample, test sample, first lot, pilot lot, or pilot models[1], and allow testing and approval of one where it is essential to have an approved first article to serve as a manufacturing standard[2]. Before first article approval, buying materials or starting production is normally at the sole risk of the contractor[2]. Those rules govern only government contracts, but the logic carries over to a private order. Write into your purchase order that bulk production starts only after your written approval of the pre-production sample, and agree who bears the cost of materials bought before it.
What to check before you sign
- materials and components against the bill of materials, including the supplier of each key part;
- dimensions against the spec and its tolerances;
- colour against the approved standard, in daylight;
- function: closures, moving parts, fit and any test the product needs;
- labels, markings, packaging and the carton;
- anything you flagged on the development samples.
Sign and date two identical samples. Keep one; the other stays at the production line as the factory's reference.
When a lab test depends on the sample
For a children's product sold in the US, the CPSC's certification rule lets tests run on samples identical in all material respects to the product, which it defines as no difference with respect to compliance to the applicable rules, bans, standards, or regulations[3] between the samples tested and the finished product sold. A pre-production sample can serve only if it truly matches production. A material change afterwards can include changes in component part composition, component part supplier, or the use of a different component part from the same supplier[3], where the change could affect compliance, and then the changed product must be tested again and the certifier must issue a new Children's Product Certificate[3]. For goods made outside the US, the CPSC's certificate rule says the importer, as defined in this part, is the finished product certifier[4]. If you import, that retesting is yours to arrange, so write into the order that no component may be swapped after approval without your written consent.
Example: an approval record
| Check | Spec | Sample | Result |
|---|---|---|---|
| Length | 30.0 cm, plus or minus 0.5 cm | 30.3 cm | Pass |
| Main fabric | 280 gsm canvas, as on the bill of materials | 280 gsm canvas | Pass |
| Colour | Approved lab dip | Visibly lighter in daylight | Fail |
| Zip | Named supplier, size 5 | Named supplier, size 5 | Pass |
| Care label | Fibre content, origin, care | Origin missing | Fail |
| Decision | Resubmit with colour and label fixed | ||
| Cost of a second sample, including courier | $85 |
Illustrative figures, not a quote. Real prices depend on the spec, quantity and factory.
A second sample costs a little money and some days. Approving the wrong colour costs the whole order, because the approved sample is what the order is inspected against.
Sources
- [1]Federal Acquisition Regulation 2.101, Definitionsacquisition.gov. Source dated 2026-03-13. Checked 2026-09-23.
- [2]Federal Acquisition Regulation Subpart 9.3, First Article Testing and Approvalacquisition.gov. Source dated 2026-03-13. Checked 2026-09-23.
- [3]16 CFR Part 1107, Testing and Labeling Pertaining to Product Certification (eCFR)ecfr.gov. Source dated 2026-09-21. Checked 2026-09-23.
- [4]16 CFR Part 1110, Certificates of Compliance (eCFR)ecfr.gov. Source dated 2026-09-21. Checked 2026-09-23.
Why get matched through us
- We name every manufacturer we suggest, so you can look into each one before you talk to it.
- It is free for brands. The manufacturers quote you directly, and any order is between you and the manufacturer.
- We share your contact details with a manufacturer only if you tell us we may.
- Company facts on this site are dated and sourced, so you can see where each one came from.
Get matched with manufacturers for your product
Tell us what you want made. We introduce you to manufacturers that fit your request and name each one. It is free for brands, and the manufacturers quote you directly.
Request quotes